Thursday, January 17, 2013

January 17, 2013 -- Office Makeover - Progress Update

With lots of self driven motivation, I packed as much stuff up as possible and stored it in the basement.  I patched up the holes in the walls, cleaned the dust and dirt off the walls and floors and prepared to paint the ceiling. This project was well on it's way.




Evan and I went to Lowe's and picked out our sink.  The only problem it that it is 49" wide.  We have a spot for 48".  So off to pondering what we should do about the extra inch.


No comments:

Post a Comment